Purpose-Built Solutions
We don’t force projects into pre-existing templates. Each system is evaluated on its own hydraulic, regulatory, site, and operations constraints.
The outcome is infrastructure that fits the community it serves.
Continuity of Expertise
No handoffs between siloed departments. The engineers who understand your project at the outset remain accountable through final delivery.
Technical Depth Without Bureaucracy
Senior-level engineering judgement without the overhead, delays, and diluted accountability common in large, consolidated firms.
Long-Term Client Relationships
Our work is built on trust, responsiveness, and professional responsibility—not transaction volume.
Independent By Design
At a time when mergers and acquisitions are concentrating the consulting industry into fewer, larger firms, SALT remains intentionally independent.
This independence allows us to prioritize engineering quality, client outcomes, and long-term technical integrity over quarterly growth targets.
SALT delivers technically rigorous solutions grounded in direct engineer involvement at every phase of the project lifecycle.
$56 Million in Designed Infrastructure
-

Beebe Water & Sewer Wastewater Treatment Plant
-

Mayflower Wastewater Treatment Plant Rehabilitation
-
Heber Springs Water and Sewer WTP Membrane Expansion
-

Mountain View Wastewater Treatment Plant
-

Vilonia Waterworks Association Saltillo Road Bridge Waterline Relocation
-

City of Heber Springs Community Center Improvements
-

City of Heber Springs Spring Park Improvements
-

Tumbling Shoals Tank Rehabilitation
-

City of Judsonia Water Pump Station
-
City of Heber Springs Splash Pad
-

City of Heber Springs Sandy Beach Bathrooms
-

Quitman Sidewalks
-

Heber Springs Water and Sewer Tank Inspections
-

Tumbling Shoals Water Authority Tank Inspections
-

City of Beebe South Fir Drainage Improvements
-

Kensett First Baptist Church Site Plan and Foundation Design
-

Beebe Ball Park Road Tank Painting
-

Heber Springs 7th Street Bank Stabilization
-

Heber Springs Huntington Place Street Improvements
-

Vilonia Waterworks Association Church Street Waterline Relocation
-
City of Beebe Splash Pad
-

Tumbling Shoals Auto-Read Meters
-

City of Heber Springs Downtown Beautification
-

Vilonia Waterworks Hydraulic Modeling
-

Judsonia Water Tank Inspection
-

Mayflower Water & Sewer Rate Analysis
-

Heber Springs Housing Authority Storage Building Site Plan
-

Clinton WTP Clearwell Isolation & Repair
-

Tumbling Shoals Rate Analysis
-

Clinton Tank Paintings
-

City of Bradford Water Rate Analysis
-

Quitman Tank Painting
-

Bald Knob North Water Public Facilities Board Rate Analysis
-

Bald Knob North Water Booster Station
-

City of Beebe Community Drive Commercial Development
-
Clinton Raw Water Intake Pump Repair
-

Clinton WTP Filter Media Replacement
-

City of Melbourne Water Booster Pump Station Improvements
-

Melbourne WWTP Improvements
-
Heber Springs Water & Sewer Airport North Tank Rehabilitation
-

Judsonia WWTP Improvements
-

Heber Springs Fire Bay Site Plan
-

Bald Knob Water Tank Inspections
-

Clinton WWTP Improvements
-
Clinton River Sewer Line Repair
-

Vilonia Waterworks Association Hwy 287 Waterline
-

Tumbling Shoals Stubbs Road Line Replacement
-
Judsonia Meter Replacement
-

Morning Star PWA Tank Rehabilitation
-

Vilonia Waterworks Association Beryl Tank Rehabilitation
-

Clinton-Bee Branch Meter Replacements
-

Clinton-Bee Branch Regionalization Waterline Replacements
-

Clinton-Bee Branch Regionalization Tank Rehabilitations
-

Clinton Water Hydraulic Modeling, Master Planning, and CIP
-

Freedom Public Water Authority Meter Replacements
-

Mountain Top Public Water Authority Meter Replacements
-

Quitman Water System Improvements